How To Install TyvaQuilt Insulation To Achieve 0.18 U-Value

Difficulty: Easy • 6 Steps

How To Install TyvaQuilt Insulation To Achieve 0.18 U-Value.

This How-To-Guide will display how to install TyvaQuilt on a Pitched Roof.

TyvaQuilt is a quick, simplistic three-product procedure to achieving refurbishment regulations.

Our bespoke solution is proven to save cost, space, wastage & installation time compared to Rigid PIR Insulation (Kingspan / Celotex

Require a U-value document for building control? Visit our free & easy to use Online U-value Calculator. Receive instant solutions in less than 60 seconds! Click Here to Use!

Multifoil-Insulation are the leading UK & European distributor of Multifoil Insulation products. We offer free next working day delivery to the UK Mainland (Order before 2pm)

Method Steps

  1. Install SuperQuilt (Part 1)

    TyvaQuilt consists of three products building regulations. 1st is SuperQuilt Under Rafter, 2nd is Non-Itch between Rafter and finally BreatherQuilt Over Rafter. Start by installing SuperQuilt under rafter. Staple SuperQuilt and roll the product out horizontally, staple at 300mm internals. Ensure all overlaps are fully taped and sealed using Thermaseal Foil Joining Tape.

  2. Install SuperQuilt (Part 2)

    Once SuperQuilt is fully stapled & taped on the rafter, you can next proceed with your counter battens. Install battens min 25mm through SuperQuilt into the rafters behind. Ensure battens are spaced between 400mm & 600mm. Once the battens are installed, proceed with installing a plasterboard in the usual manner.

  3. Fixing and Cutting

    BreatherQuilt and SuperQuilt are to be stapled using a Heavy Duty Staple Gun & 14mm Staples. All three product can be cut using the Multifoil Scissors or the cutting knife. All these accessories are available in our Multifoil Fitting Kit.

  4. Install EcoLoft Non Itch

    Next, install EcoLoft Non Itch Wool in-between the rafters. EcoLoft Non Itch is designed to suit either 400mm or 600mm centres, with the product supplied in 380mm width or 570mm. EcoLoft Non Itch is supplied in 100mm thickness. Simply stuff the Non-Itch Wool between each rafters, leaving an airspace above for the BreatherQuilt.

  5. Install BreatherQuilt (Part 1)

    Once EcoLoft Non Itch is installed, proceed to install BreatherQuilt. Start at the bottom of the rafters, roll BreatherQuilt out horizontally, stapling at min 300mm intervals. Ensure BreatherQuilt is draped into the rafters as opposed to being installed taught. Horizontal overlaps should be overlapped by 100mm, tape using Thermaseal Double Sided Tape. Vertical joists are butt jointed, and taped using waterproof tape.

  6. Install BreatherQuilt (Part 2)

    Once BreatherQuilt is fully covered on the rafters, proceed by install tile battens. Ensure there is a gap of 10mm between BreatherQuilt and Tile Batten (in center of each rafter) At the eaves, BreatherQuilt should extend onto a suitable eaves carrier. Finish with tile/slate finish on tile battens.

Buy Tools & Materials

Disclaimer – Multifoil-Insulation cannot be held responsible for any losses financially or physically from advice provided in this How-To-Guide.

Installation of SuperQuilt & BreatherQuilt should be in harmony with the official certificate. Recommended fixing materials and good building practice should also be used.

trending_flatBack to All Guides