How To Install EcoTec Shed Insulation Kit
Difficulty: Easy • 3 stepsEcohome-Insulation are the leading UK & European distributor of Multifoil Insulation products. We offer free next working day delivery to the UK Mainland (On Orders placed before 2pm over £100 + VAT)
Method steps
1. Staple EcoTec Insulation

Start by rolling out EcoTec Insulation to the desired length. Excess material can be cut using the Cutting Knife provided in the kit. Staple EcoTec Insulation directly onto the vertical studs as a flat, continuous layer. Stapling at intervals of 300mm. When stapling to the stud, this will create a cavity between the EcoTec Insulation, and the timber boards. When a cavity is created, extra thermal performance is gained.
2. Overlapping and Taping EcoTec Insulation

EcoTec Insulation should overlap by 50mm, on both horizontal and vertical joints. Ensure all overlaps are fully taped and sealed using Thermaseal Foil Joining Tape provided in the Kit. When EcoTec Insulation is fully taped and sealed, the product will also work as a high performance Vapour Control Layer, eliminating any risk of condensation.
3. Installing Counter Battens

Then install timber battens (min 19mm depth) directly over the EcoTec Insulation, so there is a cavity either side of the material once internally boarded. You can then proceed to install your desired internal boarding over the top of the timber. (Cladding, Plywood etc.)
Disclaimer - Ecohome-Insulation cannot be held responsible for any losses financially or physically from advice provided in this How-To-Guide.