Here we will demonstrate how to insulate your floor with Foil-Tec Single.

This is a highly effective vapour control membrane that also provides thermal benefits — an insulating vapour control membrane, bringing dual benefits.

Why not benefit from a highly reflective vapour control barrier, as opposed to just a conventional vapour control layer? This can be used independently on the floor to improve heat retention in your home, while protecting it from condensation.

Roll the Foil-Tec Single Out

Rolling Foil-Tec Single insulation out over floor joists

Roll the Foil-Tec Single out over the joists, overlapping each layer by 100mm.

You do not need to tape the overlaps — these act as a vent to allow moisture to dissipate.

Install Saddle Clips

Fitting saddle clips over Foil-Tec Single insulation and joists

To get optimum performance from the product, you need an air cavity on either side of the Foil-Tec Single. Place the saddle clips over the insulation and the joists — this provides an air cavity of 50mm. The saddle clips can be screwed or nailed into place.

Ideally, use 4 saddle clips per square metre of insulation.

Alternatively, Staple It Into Place

Stapling Foil-Tec Single insulation to the side of floor joists

Although the saddle clips are the best way to achieve a consistent air cavity and speed up installation, you can instead staple the Foil-Tec Single if needed. Staple to the side of the joists at every 20cm interval.

Cover Up to the Wall

Foil-Tec Single insulation brought up the wall behind the skirting board

The Foil-Tec insulation must be brought up to the wall, behind the skirting board.

We advise it goes up the wall by 75mm.

Tape and Seal

Taping and sealing the perimeter of Foil-Tec Single insulation

Tape and seal all around the perimeter, leaving the overlaps between each join untaped.

Fit Flooring

Installing flooring over Foil-Tec Single insulation

You can then install your flooring, with screws at 20cm centres, 37mm into the joists.

Disclaimer – Ecohome Insulation cannot be held responsible for any losses financially or physically from advice provided in this How-To-Guide.

Back to how to guides

Contact us

If you do require more information, please contact our team who will help you find the right solution for your project. You can contact us via phone, email, live chat, or request a callback.

Request a callback

Delivery info

We offer FREE Next Working Day Delivery to anywhere within the UK mainland on all orders over £100 + VAT. Alternatively at the checkout, you can select a suitable delivery date. We can also offer offshore deliveries; drop us an email or use our Contact Us Form and we can assist you.

Request a callback