How-To Guide

How to install YBS BreatherFoil Insulation

Difficulty: Easy • 8 steps

Watch

This easy how-to guide will show you how to install our YBS BreatherFoil onto the external of timber-framed walls. YBS BreatherFoil is the higher-performing alternative to TF200, Reflex, and Reflectashield, at a lower cost.

Ecohome-Insulation are the leading UK & European distributor of Multifoil Insulation products. We offer free next working day delivery to the UK Mainland (on orders placed before 2pm — orders over £100 + VAT).

Preparing the External Wall for Insulation

Removing existing cladding to expose OSB sarking board before fitting BreatherFoil

Prepare for the BreatherFoil installation by removing any existing cladding and exposing the OSB/sarking board.

Attaching the Initial Layer of BreatherFoil

Stapling the first layer of BreatherFoil to external timber boarding

Unroll the BreatherFoil horizontally across the wall and staple it directly to the external timber boarding, at a minimum of 300mm intervals.

Where a Vertical Joint Occurs

Overlapping and taping a vertical joint in BreatherFoil

Where a vertical joint occurs, ensure a minimum overlap of 100mm and seal using ThermaSeal Foil Joining Tape.

Where a Horizontal Joint Occurs

Overlapping a horizontal joint between rolls of BreatherFoil

When rolling out the next roll above the first, a horizontal joint is created.

Ensure a minimum overlap of 75mm, leaving the overlaps untaped.

Attaching the Second Layer of BreatherFoil

Stapling the second layer of BreatherFoil to timber boarding

Staple the BreatherFoil directly to the external timber boarding as before, at a minimum of 300mm intervals.

Vertical Taping the Perimeter

Taping the vertical perimeter of BreatherFoil with foil tape

Once the wall is fully covered, seal the vertical perimeter using ThermaSeal Foil Tape.

Leave the top and bottom untaped.

Install Timber Battens

Fixing timber battens over BreatherFoil, perpendicular to the rafters

Apply a layer of timber battens (minimum 25mm), perpendicular to the rafters, at minimum intervals of 400mm.

Install the External Finish

Finished external cladding installed over BreatherFoil and battens

Finally, apply the external finish/cladding in accordance with the manufacturer's certification, fixing instructions, and good building practice.

Disclaimer – Ecohome Insulation cannot be held responsible for any losses financially or physically from advice provided in this How-To-Guide.

Recommended fixing materials and good building practice should also be used.

Back to how to guides

Contact us

If you do require more information, please contact our team who will help you find the right solution for your project. You can contact us via phone, email, live chat, or request a callback.