How to install YBS BreatherFoil Insulation
Difficulty: Easy • 8 stepsMethod steps
1. Preparing The External Wall For Insulation

Prepare for the BreatherFoil installation by removing any Exisiting Cladding and exposing the OSB/Sarking board.
2. Attaching The Initial Layer Of BreatherFoil

Unroll the BreatherFoil Horizontally across the wall and staple it directly to the external timber boarding, at a minimum of 300mm intervals.
3. Where A Vertical Joint Occurs

Where a vertical joint occurs, ensure a minimum overlap of 100mm & seal using ThermaSeal Foil Joining Tape.
4. Where A Horizontal Joint Occurs

When rolling out the next roll above the first, horizontal joints need to be created, ensure a minimum overlap of 75mm, leaving the overlaps untaped.
5. Attaching The Second Layer Of BreatherFoil

Staple the BreatherFoil directly to the external timber boarding as before, at a minimum of 300mm intervals.
6. Vertical Taping The Perimeter

Once the wall is fully covered, begin to seal the vertical perimeter using ThermaSeal Foil Tape, leaving the top and bottom untaped.
7. Install Timber Battens

Apply a layer of timber battens (minimum of 25mm), perpendicular to the rafters at minimum intervals of 400mm.
8. Install The External Finish

Finally apply the external finish/cladding in accordance with the manufacturers certification, fixing instructions & good building practice.