How to Insulate Above a Concrete Floor Using SuperQuilt
Difficulty: Easy • 4 stepsMultifoil-Insulation are the leading UK & European distributor of Multifoil Insulation products. We offer free next working day delivery to the UK Mainland (Order before 2pm)
Method steps
1. Installing first run of SuperQuilt

SuperQuilt can be rolled out vertically or horizontally along the concrete floor. Leave enough material at the edges to protrude SuperQuilt Insulation above the floor deck. Ensure the concrete floor is fully clean, flat, and debris free.
2. Joints and Taping

Ensure SuperQuilt is butt jointed with other layers on both the verticals and horizontals. (No overlaps). Fully tape and seal all butt joists of SuperQuilt with Thermaseal 75mm ThermaSeal Foil Joining Tape.
3. Installing Battens
Timber battens or joists are then laid over the top of SuperQuilt - at 400mm centres (evenly spaced). The minimum batten depth is 50mm, increasing the batten depth enhances the performance. SuperQuilt will compress to around 7mm when timber is installed above.
4. Finish with Flooring
Proceed with installing your timber boarding floor. The deck is then fixed at 200mm centres, with 37mm screws into the joists or battens below
Disclaimer – SuperQuilt should be installed in harmony with the manufacturers certificate, fixing instructions and good building practice. Our Multifoils are to be cut using a craft knife or a sharp pair of scissors – Available in our Multifoil Fitting Kit. No personal protective equipment, clothing or handling is required. Disclaimer - Multifoil-Insulation cannot be held responsible for any losses financially or physically from advice provided in this How-To-Guide.